1. Basic circumstances: The first phase construction of Yuhua Economic and technical Developing Zone has been completed. Many large-scale enterprises are going to operation and production in succession. Now we prepare to build the second phase infrastructure within the zone, to build several high-grade highways as well as auxiliary facilities of pipes, greenbelt and lighting at the two sides of these highways.
2. Address of item: within Yuhua Economic and technical Developing Zone
3. Scope of item: length: 1.3 km, width: 50 m
4. Total investment: It is estimated that the total investment will be RMB 30 million yuan.
5. Prophase condition: The item has been confirmed by the Construction Committee.
6. Cooperative form: Provide loan or speak face to face.
7. Forecast of prospect: Cooperate with the mode of BT, it has small risk and stable investment repay. It is estimated that the number of years for construction will be one year and the repay period for investment will be 5 years.
|