南京市雨花台区招商网

Banqiao New Town, a Beautiful Riverside New Town

Three groups make up the framework of Banqiao New Town

The construction of Banqiao New Town is an important part of the Southward-expanding Project of the main urban area of Nanjing. According to the overall plan, Banqiao New Town has a total area of 60.5 sq.km, and it reaches New Qinhuai River to the north, Nanjing-Ma’anshan Expressway to its east, the Yangtze River to its west, and Jiangning River to its south. The construction is divided into three groups. The Southwest group mainly refers to the Baogang Group and Yuhua Development Zone southeast of 205 National Highway, with a planned construction area of 25sq.km. The “Green Nanjing” group is located on both sides of the Third Yangtze River Bridge, centering around the “Green Nanjing” Forest Park, with an area of about 10sq.km. The Northeast group mainly covers the residential area and the matching shopping area northeast of 205 National Highway, with an area of 25sq.km.

The Northeast group starts up earlier

The main function of the Northeast group that starts up earlier is habitation, with a planned population of 200,000. The construction includes dwellings, large-scale commercial establishments, office buildings, activity center for callan, gymnasiums, swimming pools etc., which share part of the commercial, cultural and physical exercise functions of the new Town.

The whole layout of the Northeast group can be summarized into “One center, two belts and three zones”, i.e. to build a public activity center composed of the central park of new town as well as commercial and cultural establishments centering around the Shizha Lake, to build green belts along Nanjing-Ma’anshan Expressway and Nanjing-Wuhu Expressway, and to build the three habitation zones of Huanhe residential area, Hudong residential area and Lvzhou residential area. The Northeast group is developed by stages, and the first-phase project is located south of the No. 3 planned road, north of the No.8 Road, east of Nanjing-Wuhu Railway and west of Nanjing-Ma’anshan Expressway, with a construction area of 4sq. km.

In the 1st stage of the Northeast group, the residential area and its scenic area with an area of 2 sq. km will be developed first, including the Shizha Lake and its surrounding land of 1sq.km and part of the Hudong residential area of 1sq. km. Within the year 2005, the preparation for publicly listing 800 units of land will be completed step by step.

Banqiao New Town will take on a brand-new look by the year 2012

By the end of 2005, such important civil engineering works of Banqiao Avenue, East of Lvzhou Road, Jiangda Road and Hujing Road will be finished completely and the Shizha Lake will gradually come into form. According to the plan, the Shizha Lake scenic area will be completed at the end of 2006. By the end of 2007, the residential area of the 1st stage of the Northeast group will be basically finished, and the second-stage construction for infrastructures will be started at the same time. By the end of 2008, the 4-km development zone of the 1st stage will be totally finished. By the year 2012, all the construction within 9.1sq.km of the Northeast group will be completed. Banqiao New Town will greet citizens with a beautiful and modern look.

 

南京市雨花台区招商网
>  Nanjing Investment Environment Report
>  China-EU Summit Nanjing
>  Commerce and Trade
>  Tourism
>  Real Estate
>  Basic establishment and Social Undertaking
>  Industr

Tel: 0086-25-52883477 52425961
   0086-25-52406167 52419858
Fax: 0086-25-52419858
Post Code: 210012
E-mail: lxc@njyh.gov.cn

南京市雨花台区招商网
Copyright 2006 Yuhuatai Investment and Business Development Advisory Center